Monday, April 06, 2009

The interior nearing completion...

"Bully Pulpit"
Quinn in the loft...
Interior pictures...


Sunday, April 05, 2009

The MOST important part of the project



Just completed the door for the outdoor shower which will have hot and cold water. This is the one thing that I am most looking forward to!!!

Finally a new, SAFE railing




The old railing was attached to the deck with nails...whoever built it was a complete moron. Had someone bumped it with enough force they would have most likely knocked it off and had a nasty fall.


Quinn posing in the rain!

Kitchen and Bath: Works in Process

Kitchen and bathroom coming together. Found a good plumber who started the rough-in two weeks ago, but had a family crisis in FL. Will hopefully be back on the job this week to finish up. Crossing my fingers. Why does it always seem like there are "just a few more things to get done"?

Broughton helped me create a dry creek on the left side of the garage...looks a lot cleaner now! B and Quinn love working with stone...


Ceiling fans are in and working above main room and in the loft...



Left side of the bathroom: cardboard square covers the toilet and sink base is in place...tub will go to the right of the sink...










Kitchen above right and a view from the stairs on the left...


Right side of the bathroom where tub will be located...closet with hot water tank to the right.