Friday, October 31, 2008

Steps-in-progress...



Arrived at Rock House this past Wednesday morning at 7:30a.m. and had to drive to Wahalla to pick up one last section of EZ-Flow ( http://www.ezflowlp.com/ ) for the space between the retaining wall and the garage wall. Then on to Seneca to pickup materials for the deck stairs. I found building the stairs easier than I originally thought. We decided to move the stairs from the center of the deck to the far right side so that they would not be as obtrusive. I think the way they fit on the slope works. If we were to have built them from the top center of the deck it would have looked too much like a rollercoaster...The idea was to have a connected, easy way to get from the garage to the main house. Still need to add backboards to the stairs as well as intermediate railing posts, railings, decking for the landing and a short set of steps down to a yet to be completed boardwalk.