Kitchen and Bath: Works in Process
Broughton helped me create a dry creek on the left side of the garage...looks a lot cleaner now! B and Quinn love working with stone...
Left side of the bathroom: cardboard square covers the toilet and sink base is in place...tub will go to the right of the sink...
Kitchen above right and a view from the stairs on the left...
Right side of the bathroom where tub will be located...closet with hot water tank to the right.
Sunday, January 25, 2009
Sunday with Dad at the Lake
We Spent Sunday mostly on electrical stuff.
Daddy and I , Quinn, got the stairs bolted in & the rest of the railing posts installed. We listened to music, had the heater going on, and got ALL the outlets screwed in! Now I know how to wire an electrical outlet!
It was fun!!
Thursday, January 22, 2009
Friday, October 31, 2008
Steps-in-progress...
Arrived at Rock House this past Wednesday morning at 7:30a.m. and had to drive to Wahalla to pick up one last section of EZ-Flow ( http://www.ezflowlp.com/ ) for the space between the retaining wall and the garage wall. Then on to Seneca to pickup materials for the deck stairs. I found building the stairs easier than I originally thought. We decided to move the stairs from the center of the deck to the far right side so that they would not be as obtrusive. I think the way they fit on the slope works. If we were to have built them from the top center of the deck it would have looked too much like a rollercoaster...The idea was to have a connected, easy way to get from the garage to the main house. Still need to add backboards to the stairs as well as intermediate railing posts, railings, decking for the landing and a short set of steps down to a yet to be completed boardwalk.
Thursday, October 09, 2008
Decking is now complete

I was able to install the remaining posts for the shower and about 1/2 the decking on Tuesday as the weather was good. Perfect fall day at the lake. Wednesday the weather turned and it rained just about all day. I still managed to finish the decking. Railings are next along with steps and closing in the outdoor shower stall.